Skip to content
Works And Works
ToolsFAT Protocol
Quality and testing

FAT protocols paperless, with full traceability

Record the mechanical, electrical, RCD and torque tests of your panels, attach photo evidence and deliver clear reports to your client.

4test types
On sitephone and tablet
HSEreport ready
The problem

Test protocols get lost between spreadsheets and loose photos

When each technician uses their own format, consolidating results takes longer than testing the equipment.

Scattered spreadsheets

Protocols live in Excel and Word, everyone has their own version and consolidating the information is hard.

Lost evidence

Photos stay on each technician's phone, with no link to the equipment or the test performed.

Slow reports

Putting together the final report for the client takes hours of manual work and is prone to transcription errors.

FAT Protocol brings together tests, results and evidence per panel, and generates the reports for you.

See it in action

This is what FAT Protocol looks like inside

Real screenshots of the tool on desktop and mobile, plus a 60-second tutorial with the most-used steps.

FAT Protocol main screen
Features

The whole test protocol in one place

From the test on site to the report for the client.

FAT protocols

Test log per panel with Approved, Flagged, Rejected or Fail results.

Mechanical and electrical tests

Structured checks with tracking by project and equipment.

RCD tests

A dedicated protocol for residual-current protection tests.

Torque verification

Bolt torque log with an inspection report per panel.

Photo evidence

Attach photos and documents to each test to back up the results.

HSE reports

Export the HSE report and the results per project.

Tasks and activities

Daily inspection, weekly maintenance, housekeeping and safety checks with priority and status.

Training

Courses and modules for the team within the same platform.

How to use · express

FAT Protocol in under a minute

Watch the steps like a short video. Tap right to go forward, left to go back, and press and hold to pause.

  1. Create a protocolFrom the dashboard, tap «New protocol» to start with a panel.
  2. Identify the panelEnter company, client, TAG, voltage and rated current.
  3. Do the mechanical testsMark each point as compliant or non-compliant and take the photo as evidence.
  4. Record the electrical testsEnter the insulation for each measurement; out-of-range values are flagged automatically.
  5. Sign and finishThe inspector and the person in charge sign from their phone or tablet.
  6. Deliver the reportDownload the PDF with results, observations and photos, ready for the client.
Guided tutorial

Practice on the FAT Protocol screen

We show you where to click and what to fill in on each screen. Move forward with the buttons, the keyboard arrows or by tapping the highlighted element.

Your first FAT protocol, from start to finish

Identify the panel, run the tests with evidence, sign, close and deliver the PDF to the client.

  1. Tour the FAT Protocol modulesFAT protocol, RCD, torque, tasks, HSE and reports: the whole test cycle in one bar.The active module is highlighted in yellow.
  2. See the status of your protocolsYou know how many are complete, in progress or pending without asking for a report.The numbers go up with every protocol you close.
  3. Press «NEW PROTOCOL»You start with the full structure: no test gets skipped.The wizard opens at stage 1: General information.
  4. See the 5 stages of the protocolYou move forward in order and can save at any stage: if the workday ends, you continue later.General information → Mechanical → Electrical → Operation → Finish.
  5. Enter the panel TAGThe TAG is the panel's ID: with it you find the panel in every report.See how it's filled in: TG-001.
  6. Enter the rated voltage and currentThey define the criteria for the electrical tests that follow.380 V and 630 A go into the report header.
  7. Fill in the technical inspector and the applicable standardsThe report must state who tested and under which standard: that makes it valid for the client.Inspector J. Muñoz · NCh Elec. 4/2003.
  8. Press «NEXT STAGE»What you filled in is saved and you move on to the on-site tests.«Stage 1 saved» appears and Mechanical tests opens.
  9. Press the camera on the non-compliant itemA photo taken on the spot is the evidence that avoids disputes with the client.The photo is linked to «Signage and labeling».
  10. See the measurement in redFAT Protocol flags only the values below the minimum (1 MΩ): you don't have to check them one by one.L1 – Earth: 0,8 MΩ · Review.
  11. Check the operationControl, interlocks, alarms and breakers: the first thing the client tests on delivery.Each compliant item adds to the result.
  12. The inspector and the person in charge signThe digital signature replaces paper and is dated in the report.Sign with your finger or the mouse.
  13. Choose the result: Approved, Flagged or RejectedThe client immediately sees the status and what needs fixing.Here it is «Flagged» because of the insulation to review.
  14. Press «FINISH PROTOCOL»The protocol is closed and added to your indicators.«Protocol finished» appears and the report is ready.
  15. Record the RCD testsTrip times by type (A, AC, B, F) are stored next to the instrument calibration.Type AC · 1 IΔn: 24 ms · OK.
  16. Record the torque of each boltTorque in Nm, whether it applies and whether it was verified: the traceability quality control asks for.Main busbar M12 · 70 Nm · Yes.
  17. Press «DOWNLOAD PDF»Deliver a professional report with results, observations and photos in one click.Report TG-001 is downloaded, ready to send.
Full guide

How to use FAT Protocol, module by module

Electrical panel testing from start to finish: FAT protocol in 5 stages, RCD, torque, evidence, signatures and report.

Before you start4 steps

How to access FAT Protocol from any device.

  1. Sign in to the platformGo to worksandworks.com and tap «Sign in» (top right). Enter your username and password.
  2. Open your profileAfter signing in you land on your company profile. Scroll down to «WAW Tools access».
  3. Open the toolTap the tool card and then «Open». It opens in a new tab; you can leave it open all day.
  4. Use it wherever you areWorks on phone, tablet and computer with the same user. Nothing to install.
Dashboard2 steps

The summary of your testing operation.

  1. Check the indicatorsProtocols completed, in progress and pending.
  2. Create from here«New Protocol» and «New Task» are always at hand.
FAT protocol: General information5 steps

The first of the 5 stages identifies the panel and the people in charge.

  1. Company, client and TAGThe TAG is the panel identifier in all documents.
  2. People in chargeElectrician, technical inspector, assembler and those responsible for the FAT tests.
  3. Technical dataDate, rated V (V), rated I (A), checklist 1.2 and its review date.
  4. Standards and observationsApplicable standards and general observations.
  5. Project and drawingsProject name and number; attach the drawings by phase (1 to 6).

If your client has their own format, use «Official protocol templates» to start from it.

Mechanical, electrical and operation tests4 steps

Stages 2, 3 and 4 are done on site.

  1. Mark each itemCompliant or non-compliant; if it fails, write the observation.
  2. Take the photo on the spotThe evidence is linked to the protocol item.
  3. Record measurementsInsulation per phase pair and to earth (minimum 1 MΩ). Out-of-range values are highlighted.
  4. Test the operationControl, interlocks, signaling and breaker operation.

Work from the tablet or phone next to the panel: no transcribing afterwards.

Finish: signatures and result3 steps

Close the protocol with validity for the client.

  1. The people in charge signTechnical inspector and test lead, with finger or mouse.
  2. Choose the resultApproved, Flagged, Rejected or Fail.
  3. Write the final observationsWhat must be fixed before dispatch.
RCD tests4 steps

A protocol dedicated to residual-current protection.

  1. Identify the equipmentClient, equipment, description, TAG, instrument calibration and date.
  2. Rated dataRated V and rated I.
  3. Use the reference rangesTrip ranges for types A, AC, B and F.
  4. Record results and signTrip times, observations and the technical inspector's signature.
Bolt torque protocol3 steps

Verification of the torque applied at each joint.

  1. Fill in the tableItem, description, torque in Nm, whether it applies and whether it was verified.
  2. Equipment usedInstrument, brand, model, serial number and calibration date.
  3. Signature blockTechnical inspector or client and quality control, with the verification date.
Tasks, HSE and training3 steps

What happens around the tests.

  1. Task managementDaily inspection, maintenance, housekeeping and safety checks with priority and status; «Task admin» assigns them.
  2. HSE · digital coursesAssign courses and track participation, compliance, pending items and effectiveness.
  3. Export the HSE reportChoose format and date range.
Documents and reports3 steps

What you deliver to the client.

  1. Final reportIn Documents you see the content of the final PDF and download it.
  2. Individual documentsExport each protocol separately if the client asks for it that way.
  3. Reports and statisticsFilter by date and type; the «Detailed FAT report» breaks down each test.

Check Profile and Settings (name, email, time zone) before the first report: that data appears on the documents.

Still have a question? Message us on WhatsApp o request a guided demo.

Benefits

Less paper, more control over every panel

  • A single record per panel with results, observations and evidence together.
  • Real traceability you know who tested, when and with what result.
  • Less rework no more transcribing spreadsheets and photos.
  • Built for the field works on phone and tablet, and on a big screen too.
  • Documentation ready for the client organized and consistent reports.

Built for

Panel manufacturers Electrical contractors Engineering and quality Industrial maintenance Mining and industrial projects

Available on

Phone Tablet Desktop In the cloud
WAW suite

Works better alongside other tools

Each solution is independent, but they share access and the same way of working.

Frequently asked questions

We answer your questions

What types of tests does FAT Protocol cover?

It covers mechanical, electrical, RCD and torque tests on panels, plus the photo evidence for each one.

Can I use it directly on site?

Yes. The interface is responsive and works on phone, tablet and computer, so you can record results and photos where the test takes place.

Does it adapt to my protocol formats?

We can review your current formats and adapt the tool to the way you work. Write to us and we'll look at your case.

How do I get a demo?

Fill in the form on this page or message us on WhatsApp and we'll arrange a demo with your operation.

Contact

Let's talk about FAT Protocol

Tell us about your case and we'll show you the tool working with your operation. No commitment.

WhatsApp Request a demo